Barker Ryan Stewart is assisting Cessnock City Council with the provision of surveying, civil design and traffic engineering services required for the Early Works within Stage 1 of the Wollombi Road upgrade.
Stage 1 of the project includes an upgrade to a 2.9km section of Wollombi Road between Abbotsford Street, Bellbird and West Avenue, Cessnock. It also includes Early Works to construct a new intersection at Bellbird North.
The investigation and preliminary design phase of the project will consider a range of upgrade options including new and improved intersections, road pavement and kerb improvements, additional lanes, shared pathways and renewed utilities.
Once complete, the Wollombi Road upgrade will deliver high-quality infrastructure to improve capacity, safety and traffic congestion for the local community.
Barker Ryan Stewart will deliver an Issued for Construction set of drawings and construction specifications for the new intersection at Bellbird North as part of the Early Works.
The full scope of services includes:
- Project management
- Cost modelling
- Technical specifications
- Bill of Quantities
- Safety in Design Report
- Topographic survey
- Preliminary design
- Detailed design
- Issue for Construction Design
- SIDRA modelling and Traffic Impact Assessment