Need assistance with an upcoming project?

Fill in your details below and one of our staff members will be in touch. Alternatively, you can call your local BRS office directly via the contact details in the footer of this page.

  • This field is for validation purposes and should be left unchanged.

Minmi Road, Fletcher

Traffic Engineering and Transport Planning

Barker Ryan Stewart was engaged for the provision of a Traffic Impact Assessment (TIA) Report to a planning proposal for a 150-lot residential subdivision at 505 Minmi Road, Fletcher in the Newcastle LGA. 

The site is currently undeveloped and is bounded by Minmi Road in the north, existing residential developments to the east, and proposed residential developments to the west and south-east. The only access currently available to the development site is through the existing residential area via Britannia Boulevard, County Drive and Kingfisher Drive. 

One of the main objectives of the TIA was to assess the impact of the proposed subdivision on the existing road network and whether an additional connection to Minmi Road was required as a result of the proposal. This included analysing the expected traffic generation to/from the proposed development and assessing the impact of the proposed development on the surrounding road network, in particular, the impact on the existing roundabout at the Minmi Road / Britannia Boulevard intersection. 

The report concluded that the surrounding road network will not require any upgrade works as a result of the proposed rezoning and development. 

Project Details

Client:

Barr Property & Planning

Location:

Minmi Road, Fletcher

Services:

Traffic Engineering

Get the latest industry updates and news

Signup for the Barker Ryan Stewart newsletter to get all the latest news and updates in the industry.