UDIA Awards for Excellence 2020

The awards highlight innovation, sustainability, industry leadership and excellence in urban development across NSW and the ACT. They also recognise the outstanding industry contributions in helping to create cities and communities throughout NSW.

We are proud to have worked on numerous projects which have been recognised as finalists within a variety of categories this year. We would like to congratulate our clients on their prestigious achievements.

Bonython Tower

Bonython Tower by Bonython Property and CKDS Architecture was a Mixed-Use Development finalist.

Located in the heart of Gosford, Bonython Tower is a 14-storey mixed-use development comprising of 1,200 square metres of commercial space, 56 boutique apartments, two luxury penthouses and the region’s largest event and dining venue.

Barker Ryan Stewart provided traffic engineering and planning services associated with obtaining development consent for the Bonython Tower development.

Our traffic engineering services were utilised to help negotiate suitable access and parking arrangements for the development. We also provided development feasibility services including analysing construction costs and estimating property sales to assist with determining the viability of the project.

South Village, Kirrawee

South Village by Deicorp was a Mixed-Use Development finalist.

Located in Sydney’s Sutherland Shire, South Village offers a vibrant, integrated community. The development comprises of 750 residential units across 7 buildings, a 36-outlet shopping centre, dining precinct, and a 9,000 square metre public park.

South Village is recognised for achieving exceptional urban design outcomes and providing residents with unparalleled proximity to the area’s best commercial and retail precincts.

Barker Ryan Stewart provided TfNSW (formerly RMS) project verification services associated with the construction of the Princes Highway turn and slip lanes, the widening of Oak Road, and the new Oak Road and Flora Street intersection.

Wentworth Point Marinas

Wentworth Point Marinas by Billbergia was a Mixed-Use Development and Masterplanned Communities finalist.

The waterfront village development is located in Homebush Bay, along the banks of the Parramatta River. It is an industry-leading example of the successful transformation of a former industrial area into a vibrant residential community.

The development consists of 765 residential apartments across 7 buildings, the Marina Square retail precinct, community centre, and library facilities. The retail precinct includes a Coles Supermarket, bakeries, baristas, bars, and other specialty stores.

Barker Ryan Stewart provided TfNSW project verification services associated with the construction of a bus access road to the precinct.

Eastern Creek Quarter

Eastern Creek Quarter (ECQ) by Frasers Property was a Retail Development finalist.

ECQ is a new retail, lifestyle and entertainment precinct located in a rapidly growing and changing Western Sydney.  

Situated on a 15-hectare site within the Western Sydney Parklands, ECQ is a super-neighbourhood centre anchored by a 3,800 sqm Woolworths supermarket and 43 additional specialty retail stores.  

Barker Ryan Stewart was engaged as the Principal Certifier for the internal subdivision works, and as the TfNSW Project Verifier for the related intersection works on Rooty Hill Road South.  

Have an upcoming project?

If you have any questions on how we can assist with your next project, please don’t hesitate to contact your local BRS office.

Pictured: Bonython Tower and Eastern Creek Quarter

Hunter Water Accredited Designers: The five things you need to know

  • Construction of Works – During the construction phase, the accredited design consultant conducts construction surveillance and is responsible for coordinating connections to Hunter Water’s networks.
  • Project Finalisation – Upon issue of the Certificate of Completion, ownership of the works transfers to Hunter Water and the DLP commences. The accredited design consultant submits a request for Hunter Water to issue a Section 50 Compliance Certificate.

5. How can BRS assist?

We are accredited Hunter Water design consultants with extensive experience in a variety of minor and major water and sewer infrastructure works projects for both Hunter Water and local government authorities. We can assist you by providing any of the above services required to help obtain a Section 50 Compliance Certificate.

If you have any questions on how we can assist with your next project involving Hunter Water, please don’t hesitate to contact your local BRS office.

  • Investigation and Design – The design documentation is then prepared by the accredited design consultant, who finalises it and submits it to Hunter Water. The developer can then finalise arrangements with a licensed plumber or accredited construction contractor for routine minor works, or with an accredited construction contractor for routine major works.
  • Construction of Works – During the construction phase, the accredited design consultant conducts construction surveillance and is responsible for coordinating connections to Hunter Water’s networks.
  • Project Finalisation – Upon issue of the Certificate of Completion, ownership of the works transfers to Hunter Water and the DLP commences. The accredited design consultant submits a request for Hunter Water to issue a Section 50 Compliance Certificate.

5. How can BRS assist?

We are accredited Hunter Water design consultants with extensive experience in a variety of minor and major water and sewer infrastructure works projects for both Hunter Water and local government authorities. We can assist you by providing any of the above services required to help obtain a Section 50 Compliance Certificate.

If you have any questions on how we can assist with your next project involving Hunter Water, please don’t hesitate to contact your local BRS office.

The asset-creation approval process can be summarised into four main phases:

  • Development Assessment – The process begins when the developer submits an Application for Developer Services to Hunter Water, which is then assessed and a Notice of Requirements is issued. Once a copy of the Developer Works Deed has been signed, the developer engages an accredited design consultant to complete the investigation, design phase and construction surveillance.
  • Investigation and Design – The design documentation is then prepared by the accredited design consultant, who finalises it and submits it to Hunter Water. The developer can then finalise arrangements with a licensed plumber or accredited construction contractor for routine minor works, or with an accredited construction contractor for routine major works.
  • Construction of Works – During the construction phase, the accredited design consultant conducts construction surveillance and is responsible for coordinating connections to Hunter Water’s networks.
  • Project Finalisation – Upon issue of the Certificate of Completion, ownership of the works transfers to Hunter Water and the DLP commences. The accredited design consultant submits a request for Hunter Water to issue a Section 50 Compliance Certificate.

5. How can BRS assist?

We are accredited Hunter Water design consultants with extensive experience in a variety of minor and major water and sewer infrastructure works projects for both Hunter Water and local government authorities. We can assist you by providing any of the above services required to help obtain a Section 50 Compliance Certificate.

If you have any questions on how we can assist with your next project involving Hunter Water, please don’t hesitate to contact your local BRS office.

  • Design for Complex Works – Responsible for completing the design and contract documentation for developer works in accordance with the Notice of Requirements and relevant design standards.

4. What is involved in the approval process?

The asset-creation approval process can be summarised into four main phases:

  • Development Assessment – The process begins when the developer submits an Application for Developer Services to Hunter Water, which is then assessed and a Notice of Requirements is issued. Once a copy of the Developer Works Deed has been signed, the developer engages an accredited design consultant to complete the investigation, design phase and construction surveillance.
  • Investigation and Design – The design documentation is then prepared by the accredited design consultant, who finalises it and submits it to Hunter Water. The developer can then finalise arrangements with a licensed plumber or accredited construction contractor for routine minor works, or with an accredited construction contractor for routine major works.
  • Construction of Works – During the construction phase, the accredited design consultant conducts construction surveillance and is responsible for coordinating connections to Hunter Water’s networks.
  • Project Finalisation – Upon issue of the Certificate of Completion, ownership of the works transfers to Hunter Water and the DLP commences. The accredited design consultant submits a request for Hunter Water to issue a Section 50 Compliance Certificate.

5. How can BRS assist?

We are accredited Hunter Water design consultants with extensive experience in a variety of minor and major water and sewer infrastructure works projects for both Hunter Water and local government authorities. We can assist you by providing any of the above services required to help obtain a Section 50 Compliance Certificate.

If you have any questions on how we can assist with your next project involving Hunter Water, please don’t hesitate to contact your local BRS office.

  • Creation of Routine Works – Acting as the quality manager for the asset-creation process. This includes certifying the design and verifying the works are constructed in accordance with the design. It also involves conducting inspections to ensure the works meet all environmental and WHS requirements in the Developer Works Deed. Once all of the requirements have been satisfactorily met, the accredited designer can then issue a Certificate of Completion for the works.
  • Design for Complex Works – Responsible for completing the design and contract documentation for developer works in accordance with the Notice of Requirements and relevant design standards.

4. What is involved in the approval process?

The asset-creation approval process can be summarised into four main phases:

  • Development Assessment – The process begins when the developer submits an Application for Developer Services to Hunter Water, which is then assessed and a Notice of Requirements is issued. Once a copy of the Developer Works Deed has been signed, the developer engages an accredited design consultant to complete the investigation, design phase and construction surveillance.
  • Investigation and Design – The design documentation is then prepared by the accredited design consultant, who finalises it and submits it to Hunter Water. The developer can then finalise arrangements with a licensed plumber or accredited construction contractor for routine minor works, or with an accredited construction contractor for routine major works.
  • Construction of Works – During the construction phase, the accredited design consultant conducts construction surveillance and is responsible for coordinating connections to Hunter Water’s networks.
  • Project Finalisation – Upon issue of the Certificate of Completion, ownership of the works transfers to Hunter Water and the DLP commences. The accredited design consultant submits a request for Hunter Water to issue a Section 50 Compliance Certificate.

5. How can BRS assist?

We are accredited Hunter Water design consultants with extensive experience in a variety of minor and major water and sewer infrastructure works projects for both Hunter Water and local government authorities. We can assist you by providing any of the above services required to help obtain a Section 50 Compliance Certificate.

If you have any questions on how we can assist with your next project involving Hunter Water, please don’t hesitate to contact your local BRS office.

Accredited designers can provide a range of services including:

  • Design for Routine Works – Completing the investigation, design and contract documentation for all water and sewerage works in accordance with the Notice of Requirements and relevant design standards.
  • Creation of Routine Works – Acting as the quality manager for the asset-creation process. This includes certifying the design and verifying the works are constructed in accordance with the design. It also involves conducting inspections to ensure the works meet all environmental and WHS requirements in the Developer Works Deed. Once all of the requirements have been satisfactorily met, the accredited designer can then issue a Certificate of Completion for the works.
  • Design for Complex Works – Responsible for completing the design and contract documentation for developer works in accordance with the Notice of Requirements and relevant design standards.

4. What is involved in the approval process?

The asset-creation approval process can be summarised into four main phases:

  • Development Assessment – The process begins when the developer submits an Application for Developer Services to Hunter Water, which is then assessed and a Notice of Requirements is issued. Once a copy of the Developer Works Deed has been signed, the developer engages an accredited design consultant to complete the investigation, design phase and construction surveillance.
  • Investigation and Design – The design documentation is then prepared by the accredited design consultant, who finalises it and submits it to Hunter Water. The developer can then finalise arrangements with a licensed plumber or accredited construction contractor for routine minor works, or with an accredited construction contractor for routine major works.
  • Construction of Works – During the construction phase, the accredited design consultant conducts construction surveillance and is responsible for coordinating connections to Hunter Water’s networks.
  • Project Finalisation – Upon issue of the Certificate of Completion, ownership of the works transfers to Hunter Water and the DLP commences. The accredited design consultant submits a request for Hunter Water to issue a Section 50 Compliance Certificate.

5. How can BRS assist?

We are accredited Hunter Water design consultants with extensive experience in a variety of minor and major water and sewer infrastructure works projects for both Hunter Water and local government authorities. We can assist you by providing any of the above services required to help obtain a Section 50 Compliance Certificate.

If you have any questions on how we can assist with your next project involving Hunter Water, please don’t hesitate to contact your local BRS office.

1. What is a Hunter Water Accredited Designer?

Hunter Water maintains a list of accredited design consultants who have previously demonstrated a comprehensive understanding of the Hunter Water requirements when preparing plans, constructing works and designing structures.

Accredited designers are responsible for ensuring the works are compliant with design standards, and collaborate with the licensed plumber or accredited construction contractor to certify the works have been built in accordance with the design. They are also responsible for issuing the Certificate of Completion once the routine works are finished.

2. Why do I need a Hunter Water Accredited Designer?

Hunter Water requires that any water and sewer systems for new developments are designed by a Hunter Water accredited designer and constructed by a Hunter Water accredited construction contractor for major or complex works.

Hunter Water is a State Owned Corporation that provides drinking water, wastewater, recycled water and some stormwater services to a population of approximately 600,000 people in homes and businesses across the Lower Hunter.

3. What services do Hunter Water Accredited Designers provide?

Accredited designers can provide a range of services including:

  • Design for Routine Works – Completing the investigation, design and contract documentation for all water and sewerage works in accordance with the Notice of Requirements and relevant design standards.
  • Creation of Routine Works – Acting as the quality manager for the asset-creation process. This includes certifying the design and verifying the works are constructed in accordance with the design. It also involves conducting inspections to ensure the works meet all environmental and WHS requirements in the Developer Works Deed. Once all of the requirements have been satisfactorily met, the accredited designer can then issue a Certificate of Completion for the works.
  • Design for Complex Works – Responsible for completing the design and contract documentation for developer works in accordance with the Notice of Requirements and relevant design standards.

4. What is involved in the approval process?

The asset-creation approval process can be summarised into four main phases:

  • Development Assessment – The process begins when the developer submits an Application for Developer Services to Hunter Water, which is then assessed and a Notice of Requirements is issued. Once a copy of the Developer Works Deed has been signed, the developer engages an accredited design consultant to complete the investigation, design phase and construction surveillance.
  • Investigation and Design – The design documentation is then prepared by the accredited design consultant, who finalises it and submits it to Hunter Water. The developer can then finalise arrangements with a licensed plumber or accredited construction contractor for routine minor works, or with an accredited construction contractor for routine major works.
  • Construction of Works – During the construction phase, the accredited design consultant conducts construction surveillance and is responsible for coordinating connections to Hunter Water’s networks.
  • Project Finalisation – Upon issue of the Certificate of Completion, ownership of the works transfers to Hunter Water and the DLP commences. The accredited design consultant submits a request for Hunter Water to issue a Section 50 Compliance Certificate.

5. How can BRS assist?

We are accredited Hunter Water design consultants with extensive experience in a variety of minor and major water and sewer infrastructure works projects for both Hunter Water and local government authorities. We can assist you by providing any of the above services required to help obtain a Section 50 Compliance Certificate.

If you have any questions on how we can assist with your next project involving Hunter Water, please don’t hesitate to contact your local BRS office.

Women in the Property and Infrastructure Industry: Lisa Wrightson

In our ‘women in the property and infrastructure industry’ series, we give you a little more insight into the talented women who form an integral part of the BRS team. This blog post features Lisa Wrightson, who is the Planning Manager / Heritage Advisor at BRS.

Describe your career path and how you have progressed to your current role.

After high school, I went straight to university where I completed a Bachelor of Town Planning at the University of NSW.  This led me to work in local government for about 16 years in five different council areas gaining a wide variety of experience, in strategic and statutory planning as well as specialisation in heritage, coastal, rural residential and social policy development.

I never thought that I’d ever work in private practice, however after working part time with BRS, I realised that I really enjoyed the work and the variety that it offered.  I’ve now been working almost full time for the BRS for about 6 years and in 2019 became the Planning Manager.

What does a day in your working life look like?

My workdays are varied, which I enjoy and can vary from tender and fee proposal preparation, to writing one of the wide variety of reports we offer, or site inspections and meetings which have more recently become virtual.  It is not only the work that is varied but also the location, this year alone has seen me undertake work in Kyogle, Muswellbrook, all parts of Sydney, Berry, Wagga Wagga, Bathurst, and Newcastle.

What is the favourite part of your role?

My favourite part of my role is the people I work with. I find that between the BRS team and our clients, there is always someone that helps make my day better.

How is your role integral to BRS’ operations?

I’d like to think that my role ensures the planning team operates smoothly and is able to produce high quality work on time and to budget.

What have been some of the highlights of working at BRS?

I always enjoy seeing a project you have been working on come to fruition and be built and play an important part in a local community. Some of the new developments in Gosford CBD are now being built and becoming part of the landscape and it’s exciting to see the area grow and develop and become a more vibrant centre.

Our annual conference and social events are also always a highlight as you get to catch up with staff from the other offices.

What is one thing that surprised you about working at BRS?

Initially it surprised me that I was enjoying working for a private consultancy, after getting over the initial surprise, I realised that I was working with a great bunch of people, doing a wide range of work and having fun.

How has BRS been able to support your career progression?

BRS have been very supportive of any professional development I’ve wanted to undertake.  I’ve attended a number of conferences / workshops and have even presented at one or two. 

I think what has really helped is our annual conferences each year, it gives us the opportunity to share our knowledge, have input into the company and build personal growth.

What do you enjoy doing outside of the office?

I love hanging out with my family and spending time in the country or at the beach.  I love building Lego and jigsaw puzzles as well, my most recent creation was the Lego Flintstones House which takes pride of place.

What are you looking forward to achieving this year?

With all the challenges that have been happening this year with COVID, I think I’m just looking forward to getting through the year healthy and happy. 

Workwise, I’m keen to make sure we can continue to provide quality planning work to our existing clients and hopefully meet and assist some new ones.

Want to get to know our team a bit better?

Check out our other ‘women in the property and infrastructure industry’ blogs to learn more about our team.